Can the ES300 be operational within one week of being delivered on site?
Can the user select the level of charging for each of the ports?
How can we manage the peak-draw of the system from our local distribution or grid connection?
Is there an operational limit to how many cycles per day your system can handle? In other words if we fully discharged the system, then charged back up with 150-300 kW of grid power, then immediately discharged fully again - are there any thermal or other limitations that put a limit on this type of operation?
If connected to grid power for charging and there is a utility outage, is the unit able to operate independently from the grid? We understand it could only provide whatever power is in the batteries until the utility outage is resolved, but wondering whether if it is fully charged it could still support vehicle charging in a limited capacity.